Taihui Blowing Machine Operating Procedures

First, the purpose:


     The operation of the blow molding machine is standardized, standardized, and safe production is ensured.


2. Scope:


     Suitable for the use, operation and maintenance of the blow molding machine.


Third, the content


1. Before each shift, you must add lubricant to each moving part.


3. Check whether the moving parts are firm before the production, whether the screws are loose or not, especially in the place with strong impact force, whether the transmission part is abnormal.


4. Check whether the high pressure gas source, low pressure gas source, power source and water source are normal.


5. Check each emergency stop switch, safety door switch, and protection device to check whether the switch is normal.


8. Check whether the pneumatic components are leaking and whether the action is sensitive.


9. Check if the triple valve body is abnormally leaking, is it blocked, and the water storage capacity of the water cup is too full.


10. When the electromagnetic valve of the blowing machine encounters an abnormality, it should be cleaned in time (500,000 cleaning per blow bottle).


11. Blowing molds must be cleaned and cleaned regularly.


12. When opening the high and low pressure air source switch, it must be slow to prevent the air flow rate from being too fast. The dirt is blown into the solenoid valve, and the exhaust valve is opened for 30 seconds to ensure the air is clean.


13. When starting the machine, you must be sure that the mechanical part is good and there is no foreign matter. Especially the position of the movement, so as not to hurt people. Also close the security door.


14 The warming machine must be started before starting the machine to prevent voltage fluctuations. Make sure the cooling water is not turned on before starting the warming.


15. After warming up (2 - 3) minutes, the temperature of the oven is raised evenly, and then the embryo is placed.


16. During the operation of the machine, the blower should pay attention to safety when placing the blank and taking the bottle. Do not put your hand into the mold.


17. In case of emergency, press the emergency stop button to brake urgently. Then, according to the situation of the situation analysis, find the problem and solve the problem quickly.


18. When the machine is running, it is necessary to pay close attention to whether the machine has abnormal noise. It is necessary to find it early and solve it in time.


19. After the machine is in normal operation, do not extend any part of the body into the machine to avoid injury to the robot. If the machine has abnormal noise, it must be observed carefully.


20. After the machine is in normal production, the operator must always observe the quality of the bottle to avoid voltage fluctuations or other reasons affecting the quality of the blowing bottle.


21. When the machine is being repaired, press the touch screen fault repair button to ensure safe maintenance. If you need to manually observe the movement of each cavity separately, please pay attention to the position of the arm. At the same time, be sure to understand the role of the individual buttons, and then move to ensure that the malfunction caused unnecessary trouble.


22, after the machine is repaired, be sure to clean tools and screws, etc., so as not to remain in the machine, affecting the normal operation of the machine, to avoid accidents.